Time and work: formulas and method

Quantitative Aptitude › Time and Work

Method

  1. Treat the whole job as 1 unit (or the LCM of the days).
  2. Rate = 1 / days.
  3. Add rates for people working together.

Formulas

  • A and B together: xy / (x + y) days
  • M1 × D1 = M2 × D2 (same work)